APA 6th edition
In-text citation: (Emrul Kays et al., 2016)
Reference: Emrul Kays, H. M., Karim, A. N. M., Varela, M. L. R., Santos, A. S., & Madureira, A. M. (2016). Balancing and scheduling in extended manufacturing environment.
Journal of Information Systems Engineering and Management, 1(1), 55-63.
https://doi.org/10.20897/lectito.201609
Vancouver
In-text citation: (1), (2), (3), etc.
Reference: Emrul Kays HM, Karim ANM, Varela MLR, Santos AS, Madureira AM. Balancing and scheduling in extended manufacturing environment. J INFORM SYSTEMS ENG. 2016;1(1):55-63.
https://doi.org/10.20897/lectito.201609
AMA 10th edition
In-text citation: (1), (2), (3), etc.
Reference: Emrul Kays HM, Karim ANM, Varela MLR, Santos AS, Madureira AM. Balancing and scheduling in extended manufacturing environment.
J INFORM SYSTEMS ENG. 2016;1(1), 55-63.
https://doi.org/10.20897/lectito.201609
Chicago
In-text citation: (Emrul Kays et al., 2016)
Reference: Emrul Kays, H. M., A. N. M. Karim, M. L. R. Varela, A. S. Santos, and A. M. Madureira. "Balancing and scheduling in extended manufacturing environment".
Journal of Information Systems Engineering and Management 2016 1 no. 1 (2016): 55-63.
https://doi.org/10.20897/lectito.201609
Harvard
In-text citation: (Emrul Kays et al., 2016)
Reference: Emrul Kays, H. M., Karim, A. N. M., Varela, M. L. R., Santos, A. S., and Madureira, A. M. (2016). Balancing and scheduling in extended manufacturing environment.
Journal of Information Systems Engineering and Management, 1(1), pp. 55-63.
https://doi.org/10.20897/lectito.201609
MLA
In-text citation: (Emrul Kays et al., 2016)
Reference: Emrul Kays, H. M. et al. "Balancing and scheduling in extended manufacturing environment".
Journal of Information Systems Engineering and Management, vol. 1, no. 1, 2016, pp. 55-63.
https://doi.org/10.20897/lectito.201609